|
|
|
Long Range Paving Plan
|
VIEW ENTIRE DOCUMENT * or select individual sections below
1 -
INTRODUCTION
1.1 BACKGROUND
1.2 PROJECT SCOPE AND OBJECTIVES
1.3 CURRENT PAVING PROGRAM
2 -
PAVEMENT MANAGEMENT SYSTEM
2.1 INTRODUCTION TO PAVEMENT MANAGEMENT
2.2 PMS SOFTWARE SELECTION PROCESS
2.3 REVIEW OF CANDIDATE PMS SOFTWARE
2.4 CARTÉGRAPH PAVEMENTVIEW PLUS
2.4.1 Schema Modification
2.4.2 Form Modifications
2.4.3 Data Modifications
2.4.4 Report Modification
3 -
PAVEMENT MANAGEMENT DATA
3.1 PMS DATA REQUIREMENTS
3.2 PAVEMENT DATA SELECTED FOR METRO PMS
3.3 BENEFITS OF DIGITAL IMAGE-BASED DATA COLLECTION
3.4 GIS UPDATES
3.5 DATA COLLECTION PROCESS
3.5.1 Network Definition
3.5.2 Data Collection Vehicle
3.5.3 Pavement Distress Data
3.5.4 Right-of-Way Images
3.5.5 Road Roughness Data
3.6 OVERALL CONDITION INDEX
3.6.1 Pavement Condition Index
3.6.1.1 Developement of PCI Procdure
3.6.1.2 Implementation of PCI Procdure
3.6.2 Determination of Raveling
3.6.3 International Roughness Index
3.7 FINANCIAL DATA
3.7.1 Budgets
3.6.2 Costs
3.8 GASB 34 REQUIREMENTS
3.9 CURRENT NETWORK CONDITION
3.10 DETERIORATION MODELS
4 -
PAVEMENT MANAGEMENT PROCESS
4.1 ROLE OF THE PMS SOFTWARE AND PAVEMENT MANAGER
4.2 DATA PROCESSING
4.2.1 Existing Data
4.2.2 Routing and Existing Data
4.2.3 Calibration
4.2.4 Field QC Checks
4.2.5 Data Transmittal
4.2.6 Raw Data QC
4.2.7 Edit Run Infomation
4.2.8 Sensor Data QC
4.2.9 Survey Data QC
4.2.10 Upload QC
4.2.11 Copy QC
4.2.12 Tracking
4.3 ROLE OF THE OCI
4.4 TREATMENT SELECTION MATRIX
4.5 NETWORK PRIORITIZATION RATING CALCULATION
4.6 WORK PLAN GENERATION
4.7 MODEL SCOPE
4.8 GIS MAPPING OF PAVING PROJECTS
5 -
IN-HOUSE PAVING AND CONTRACTOR PAVING PROGRAMS
5.1 CONTRAST BETWEEN IN-HOUSE PAVING AND CONTRACTOR SERVICES
5.2 IN-HOUSE PAVING
5.2.1 Emergency and Safety Projects
5.2.2 Budget Constraints
5.2.3 Time Constraints
5.2.4 Citizen Interaction
5.3 CONTRACTOR PAVING
5.3.1 Sole Responsibility
5.3.2 Productivity and Flexibility
5.3.3 Extended Work Hours
5.3.4 Large Project Responsiveness
5.3.5 Streamlined Procurement Practices
5.4 CONTRACTOR PAVING CAPABILITIES
5.5 VALIDITY OF COST COMPARISONS BETWEEN IN-HOUSEAND CONTRACTOR PAVING
5.6.1 In-Place HMAC
5.6.2 Milling of Bituminous Pavement
5.7 ASSIGNMENT OF A GROUP PAVING PROJECT TO MPW
6 -
COMMUNITY OUTREACH
6.1 OBJECTIVES OF OUTREACH PROGRAM
6.2 INFORMATION TO BE MADE AVAILABLE
6.3 ORGANIZATION OF THE WEB SITE
6.4 USE OF THE WEB BROWSER
6.5 DESCRIPTION OF WEB SITE
7 - STAFF
ORGANIZATION AND WORKLOAD DISTRIBUTION
7.1 PAVING OFFICE'S ROLE WITHIN ENGINEERING
7.2 CURRENT STAFF ORGANIZATIONAL STRUCTURE AND WORKLOAD
7.2.1 Pavement Management
7.2.2 Service Requests
7.2.3 Utility Coordination
7.2.4 Contract Design, Administration, and Construction Inspection
7.2.5 Data Collection
7.3 CURRENT STAFF ORGANIZATIONAL STRUCTURE AND WORKLOAD
7.4 FUTURE OBJECTIVES
8 -
GUIDELINES FOR PERFORMING RESURFACING & PAVEMENT PRESERVATION TREATMENTS
8.1 PAVEMENT PRESERVATION AND RESURFACING METHODS
8.2 PURPOSE OF PAVEMENT PRESERVATION METHODS
8.3 PAVEMENT PRESERVATION AND PAVEMENT MANAGEMENT
8.3.1 MPW Preservation Program
8.3.2 Integrating Pavement Preservation Treatments into a PMS
8.3.3 Treatment Selection
8.3.4 Utility Cut Repairs
8.4 COSTS AND BENEFITS
8.5 IDENTIFICATION OF NEEDS AND PRIORITIZATION
8.6 SHORT-TERM IDENTIFICATION OF NEEDS AND PRIORITIZATION
8.6.1 Short Term Identification of Needs
8.6.2 Prioritization of Short-Term Needs
8.7 MULTI-YEAR IDENTIFICATION OF NEEDS AND PRIORITIZATION
8.7.1 Generation of Feasible Alternatives
8.7.2 Multi-Year Prioritization
8.7.3 Integrating Preventive Maintenance with Multi-Year Prioritization
8.7.4 Reporting Results and Consequences of Different Funding Levels
8.8 PRIORITIZED BUDGETING
8.9 PROJECT DESIGN AND IMPLEMENTATION
8.10 SHORT TERM PLAN FOR PAVEMENT RESURFACING AND PRESERVATION
8.11 MULTI-YEAR PLAN FOR PAVEMENT RESURFACING AND PRESERVATION
8.11.1 Five-Year Plan
8.11.2 Twelve-Year Plan
9 - SUMMARY AND
RECOMMENDATIONS
9.1 IMPLEMENTATION OF PMS IN NASHVILLE AND DAVIDSON COUNTY
9.2 RECOMMENDATIONS FOR CONSIDERATION
APPENDIX
A - MPW PAVING CAPACITY
APPENDIX
B - GLOSSARY
APPENDIX
C - RESURFACING AND PAVEMENT PRESERVATION TREATMENTS
APPENDIX
D - UTILITY CUT REPAIR GUIDELINES AND SPECIFICATIONS FOR THE PERMITTING PROCESS
|
|
|
If you have any further questions regarding Metro Nashville Paving Program, please do not hesitate to Contact Us.
|
|
|